Project Appraisal Guidelines

The National Roads Authority has launched new guidelines for the appraisal of national road projects. The Project Appraisal Guidelines are being published in electronic format only and are available for download below. Each of the files below is either in PDF, .XLS or .txt format. The documentation available includes the main ‘Project Appraisal Guidelines’ document and a series of Technical Appendices for the expert user which cover the provision of detailed advice on traffic modelling, CBA, software, costs et cetera. The Project Appraisal Guidelines are intended to help road designers and decision makers on road projects through the process of ensuring that the best choices are made and the best value for money is obtained on all national road projects. In short – the right project in the right place at the right price. The Guidelines are in compliance with the Department of Finance’s Guidelines on the Appraisal and Management of Capital Expenditure Proposals in the Public Sector” as well as the Department of Transport’s “Guidelines on a Common Appraisal Framework for Transport Projects and Programmes”, and bring Ireland in line with international best practice in project appraisal.

DOCUMENT

VERSION SIZE

Project Appraisal Guidelines

1.0

1.53MB

NRA Project Appraisal Guidelines Circular

1.0

808KB
Technical Appendices
Appendix 1: Traffic Modelling and Economic Appraisal Pro Forma

1.0

45.5KB
Appendix 2a: TMR Checklist

1.0

223KB

Appendix 2b: COBA Audit Checklist

1.0

43.0KB
Appendix 3: Guidance on Traffic Modelling

1.0

534KB
Appendix 4: Origin Destination Survey Form

1.0

38.5KB
Appendix 5: Guidance on Conducting CBA

1.0

660KB
Appendix 6: National Parameters Value Sheet 

1.0

757KB
Appendix 7: COBA Guidance

1.0

1.11MB
Appendix 8: TRL COBA Report

1.0

1.59MB
Appendix 9a: Default COBA Input File

1.0

376KB
Appendix 9b: COBA Ireland Default Input File Low Growth

1.0

13.0KB
Appendix 10: TUBA Guidance

1.0

321KB
Appendix 11a: TUBA Standard Economics File

1.0

18.5KB
Appendix 11b: TUBA Standard Scheme File

1.0

23.8KB
Appendix 12: Guidance Note on the Preparation of Scheme Costs

1.0

728KB
Appendix 13: Input cost and residual value spreadsheet - Route Selection

1.3

89.0KB
Appendix 14: Input cost and residual value spreadsheet - Preliminary Design

1.2

80.0KB
Appendix 15: Input cost and residual value spreadsheet - Construction Documents

1.2

79.5KB
Appendix 16: Input cost and residual value spreadsheet  - Closeout

1.2

61.5KB
Appendix 17: Sample Business Case

1.0

3.17MB
Appendix 18: Project Brief

1.0

8.69MB
Appendix 19: Sample Traffic Modelling Report

1.0

2.17MB

Appendix 20: Sample Cost Benefit Analysis Report

1.0

6.08MB

Appendix 21: Sample Project Appraisal Balance Sheet

1.0

122KB

Appendix 22: Sample Post Project Review

1.0

350KB
Appendix 23: Figure 2.1 Major Schemes Appraisal Process Flow Chart

1.0

158KB