Project Appraisal Guidelines
The National Roads Authority has launched new guidelines for the appraisal of national road projects. The Project Appraisal Guidelines are being published in electronic format only and are available for download below. Each of the files below is either in PDF, .XLS or .txt format. The documentation available includes the main ‘Project Appraisal Guidelines’ document and a series of Technical Appendices for the expert user which cover the provision of detailed advice on traffic modelling, CBA, software, costs et cetera. The Project Appraisal Guidelines are intended to help road designers and decision makers on road projects through the process of ensuring that the best choices are made and the best value for money is obtained on all national road projects. In short – the right project in the right place at the right price. The Guidelines are in compliance with the Department of Finance’s “Guidelines on the Appraisal and Management of Capital Expenditure Proposals in the Public Sector” as well as the Department of Transport’s “Guidelines on a Common Appraisal Framework for Transport Projects and Programmes”, and bring Ireland in line with international best practice in project appraisal.
DOCUMENT |
VERSION | SIZE |
|---|---|---|
Project Appraisal Guidelines |
1.0 |
|
| NRA Project Appraisal Guidelines Circular | 1.0 |
808KB |
| Technical Appendices | ||
| Appendix 1: Traffic Modelling and Economic Appraisal Pro Forma | 1.0 |
45.5KB |
| Appendix 2a: TMR Checklist | 1.0 |
223KB |
Appendix 2b: COBA Audit Checklist |
1.0 |
43.0KB |
| Appendix 3: Guidance on Traffic Modelling | 1.0 |
534KB |
| Appendix 4: Origin Destination Survey Form | 1.0 |
38.5KB |
| Appendix 5: Guidance on Conducting CBA | 1.0 |
660KB |
| Appendix 6: National Parameters Value Sheet | 1.0 |
757KB |
| Appendix 7: COBA Guidance | 1.0 |
1.11MB |
| Appendix 8: TRL COBA Report | 1.0 |
1.59MB |
| Appendix 9a: Default COBA Input File | 1.0 |
376KB |
| Appendix 9b: COBA Ireland Default Input File Low Growth | 1.0 |
13.0KB |
| Appendix 10: TUBA Guidance | 1.0 |
321KB |
| Appendix 11a: TUBA Standard Economics File | 1.0 |
18.5KB |
| Appendix 11b: TUBA Standard Scheme File | 1.0 |
23.8KB |
| Appendix 12: Guidance Note on the Preparation of Scheme Costs | 1.0 |
728KB |
| Appendix 13: Input cost and residual value spreadsheet - Route Selection | 1.3 |
89.0KB |
| Appendix 14: Input cost and residual value spreadsheet - Preliminary Design | 1.2 |
80.0KB |
| Appendix 15: Input cost and residual value spreadsheet - Construction Documents | 1.2 |
79.5KB |
| Appendix 16: Input cost and residual value spreadsheet - Closeout | 1.2 |
61.5KB |
| Appendix 17: Sample Business Case | 1.0 |
3.17MB |
| Appendix 18: Project Brief | 1.0 |
8.69MB |
| Appendix 19: Sample Traffic Modelling Report | 1.0 |
2.17MB |
Appendix 20: Sample Cost Benefit Analysis Report |
1.0 |
|
Appendix 21: Sample Project Appraisal Balance Sheet |
1.0 |
122KB |
Appendix 22: Sample Post Project Review |
1.0 |
350KB |
| Appendix 23: Figure 2.1 Major Schemes Appraisal Process Flow Chart | 1.0 |
